A specialized project for sludge removal and cleaning of primary treatment tanks inside Hitt Station. The objective was to improve operational efficiency and prevent accumulated deposits from affecting station performance.
Client
National Water Company (NWC)
Service Provided
Sludge Tank Cleaning and Sediment Removal
Project Status
Successfully Completed
This project is considered one of the important operational projects that contribute to improving the efficiency of wastewater treatment systems. The work included cleaning primary treatment tanks inside Hitt Station, where these tanks play a key role in separating solids before biological treatment stages.
The project aimed to remove accumulated deposits that affect operational efficiency and raise tank readiness to ensure the continuity of operational processes inside the station without obstacles.
The scope of work in this project included:
The project faced a number of important operational challenges, most notably:
The project was implemented according to a precise operational methodology to achieve the highest levels of quality and efficiency, which included:
The project was carried out according to the highest professional safety standards, including:
WhatsApp us