A specialized project involving the cleaning of chlorine basins and removal of accumulated sludge to a depth of up to 3.5 meters at Manfouha Plant, Riyadh. The objective was to improve treatment efficiency and ensure water quality standards.
Client
National Water Company (NWC)
Service Provided
Chlorine Basin Cleaning & Sludge Removal
Project Status
Successfully Completed
This project is considered one of the critical operational cleaning projects in water treatment facilities. The scope included cleaning chlorine basins inside Manfouha Plant, which play an essential role in ensuring treated water quality before distribution or reuse.
The project focused on removing accumulated deposits and sludge that negatively impacted operational efficiency, while restoring basin performance to meet required water quality standards.
The scope of work in this project included:
The project faced a number of important operational challenges, most notably:
The project was implemented according to a precise operational methodology that considered the nature and sensitivity of the site. It included:
The project was carried out according to the highest professional safety standards, including: